Enable and validate the eight dedicated NetApp storage ports, build the intended VLAN 972 storage paths, and migrate the applicable VMware NFS data LIFs from the existing shared path to the dedicated interfaces.
The work will be performed in phases with validation gates before any production LIF movement. Existing production storage connectivity will remain in place until the dedicated paths have been validated.
Implementation will follow the detailed change plan provided by Plante Moran.